Gipsey Bridge Academy - Fire Door Installation
Executive Summary:
This project involved a comprehensive refurbishment of an existing facility, covering extensive external works, structural improvements and a complete internal fit-out. The aim was to enhance the building's accessibility, functionality and visual quality while resolving long-standing drainage issues and modernising the internal environment. The project delivered a fully upgraded, compliant and aesthetically improved space suitable for current and future operational needs.
Project Objectives:
- Improve building accessibility and compliance with modern standards.
- Resolve external drainage issues effecting building performance.
- Upgrade structural openings with new windows and doors.
- Modernise the internal environment with new finishes and joinery
- Deliver a durable, low maintenance space for long term use.
Scope of Works:
External Refurbishment:
- Installation of updated drainage infrastructure
- Accessibility ramp creation
- Metal ramp works
- New Windows and Doors installation
- Roofing works - Industrial clean and repair works
Internal Refurbishment:
- Ceiling Grid system & tiles
- Flooring throughout
- Installation of fire doors
- Installation of kitchenette
- Joinery works - New skirting, architraves
- Decorating works
Project outcomes:
- A fully modernised building interior with seamless finishes
- Significantly improved accessibility, ensuring compliance with inclusive design standards
- Better building performance through upgraded drainage and weatherproofing
- Enhance energy efficiency with new windows and doors
- Long lasting, durable materials suited to heavy use.
- A more welcoming, functional and professional environment for staff and clients.
Client benefits:
- Reduced future maintenance costs.
- Improved user satisfaction and operational efficiency.
- A safer, compliant building with improved access.
"The RWB building team were professional throughout and worked with the school to ensure there was no disruption on the school. The work was finished to a high standard, we would highly recommend them."











